Minimal Impact
Aerial view of a frozen river valley in boreal forest, with a small drilling spread set on one bank and no cleared right of way visible across the valley
Trenchless engineering consultants · Alberta and British Columbia

We know what the bore is going to do, because we drilled two thousand kilometres of them.

Minimal Impact is a consultancy. It is the same practice that, under its earlier names, put 2,108.8 km of pipe in the ground across 5,722 bores between 2005 and 2018 without opening a trench — and several thousand kilometres more by conventional means before and alongside it. The rigs are gone. The engineering, the methods, the drill records and the hard-won judgement are not — and that is now what we sell.

The short version

Trenchless work goes wrong in a small number of well-understood ways.

A profile that was never drillable in that ground. A pull force nobody checked against the pipe. An annular pressure limit nobody wrote down. A fluid programme copied from a different formation. A bore that strayed inside the separation distance from a live line. Each of these is cheap to catch on paper and expensive to find in the field.

We are retained to catch them on paper — and then, if you want, to stand over the rig while someone else drills it and make sure the plan survives contact with the ground.

Before it is priced

Is it drillable at all?

Route and feasibility, method selection, and an honest answer about ground that will not take a bore. The cheapest crossing is the one you move fifty metres upstream.

Feasibility →
Before it is drilled

Will this plan work?

Bore design, pull-force checks, the fluid programme, the execution plan and the inspection and test plan. A method statement read by someone who has actually run the rig it describes.

Bore design →
While it is drilled

Is it being built to the plan?

Our engineer on your side of the table, watching the pressures, the returns and the as-built, with the authority you give them to stop the pull.

Owner's representative →
Our specialty

Most firms can advise on a river crossing. Far fewer have built an entire pipeline without a trench.

The usual picture of trenchless is a single long bore under an obstacle, with conventional trenching either side of it. That is the easy half of what we know.

The harder discipline — and the one this practice is built on — is trenchless pipeline installation: putting the whole line in as a chain of back-to-back drilled segments, so the ground between the tie-in points is never opened at all. A recent northeast British Columbia system was engineered this way at 149 trenchless segments totalling 31,267 m — about 80 per cent of a 65 km alignment — average segment 420 m, longest just over a kilometre, with roughly three-quarters of the permitted disturbance footprint designed to be handed back untouched.

The record behind the advice

Numbers, not adjectives.

2,108.8km installed, 2005–2018
5,722bores on record
3,217 mlongest single installation
0.00lost-time injury frequency, 2018

Those are the trenchless figures of this practice between 2005 and 2018 — trading then as Technical HDD — across five bases and a thirteen-rig fleet from twenty to three hundred and seventy-five tonnes. They count bored metres only; the career across all methods, conventional work included, runs to several thousand kilometres more. They are a record of what was built, not a claim about what we will build for you — we no longer drill. They are here because they are the reason our engineering judgement is worth retaining.

Why we do not drill

An opinion on the method is worth more from someone who is not bidding the work.

When the firm that reviews the crossing is also the firm that wants to drill it, you are not getting engineering advice. You are getting a proposal with a covering letter.

Minimal Impact owns no rigs, self-performs nothing, and has no stake in who gets the contract. There are good trenchless contractors in this market and we will tell you which ones suit your ground, your season and your risk — and then hold whichever one you pick to exactly the same standard.

We are paid for the opinion. Never for the work that follows it.

Start here

Tell us what is being crossed.

Give us the feature, the pipe size, the length and the ground, and we will tell you within a day whether it is a straightforward crossing, a difficult one, or one that should be moved. That first read costs you nothing.